vraned
06-15-2007, 08:52 PM
Rotisserie specifically built for use on e9:
* Disassembles into 6 pieces.
* Indexed at 45-degree increments.
* Counter-weighted design (weights included).
* Mounts at front and rear subframe pickups.
* Travel locking bolts.
* Steel casters welded on base.
* Removable 12" pneumatic casters for rotisserie carriage.
* 4" x 4" tube runs length of rotisserie, joining front and rear rotisserie carriage, to maintain uni-body dimensions.
* 2" diameter rotisserie spindles on self aligning sealed bearings.
Asking $750 (less than the cost of the steel alone).
http://www.vranedom.com/yearinconcord/P2280002.JPG
http://www.vranedom.com/lodi/P1010009.JPG
http://www.vranedom.com/underinner/P1010014.JPG
http://www.vranedom.com/assembly/P4300130.JPG
* Disassembles into 6 pieces.
* Indexed at 45-degree increments.
* Counter-weighted design (weights included).
* Mounts at front and rear subframe pickups.
* Travel locking bolts.
* Steel casters welded on base.
* Removable 12" pneumatic casters for rotisserie carriage.
* 4" x 4" tube runs length of rotisserie, joining front and rear rotisserie carriage, to maintain uni-body dimensions.
* 2" diameter rotisserie spindles on self aligning sealed bearings.
Asking $750 (less than the cost of the steel alone).
http://www.vranedom.com/yearinconcord/P2280002.JPG
http://www.vranedom.com/lodi/P1010009.JPG
http://www.vranedom.com/underinner/P1010014.JPG
http://www.vranedom.com/assembly/P4300130.JPG