oilcan93
Active Member
So we've taken the Green Meanie down to the block and head. Some stuff we're replacing (injectors, etc) and some we're sandblasting and powder-coating (plenum and runners)
I'm attaching a link to the pics I took in the beginning to send SF Don before he came out to work. I'll update the link with more pics later as I clean the block and as the project culminates in February with the install of the new Megasquirt system
http://s1337.photobucket.com/user/tarheelboy93/library/Green%20Meanie/Green%20Meanie
I'm attaching a link to the pics I took in the beginning to send SF Don before he came out to work. I'll update the link with more pics later as I clean the block and as the project culminates in February with the install of the new Megasquirt system
http://s1337.photobucket.com/user/tarheelboy93/library/Green%20Meanie/Green%20Meanie
Last edited: