So far I've undertaken the following on the CSL since I've had to work from home:
Had my Alpina mags refinished, now having tyres fitted;
Ordered carpet from KHM for the CSL;
Block off to be re-bored;
Ordered the last of the engine/gear box bits from W&N;
Sent off the steering rod to be lengthened for the RHD manual box;
Ordered some misc parts from Jaymic as they were literally closing the shop;
Sent my CSL radiator to be re-cored;
Had the starter motor re-conditioned.
Sent prop shaft off to be re-furbished;
Figured if things get bad here I want the parts handy so I can keep working on her. Will update the build thread soon.
Have also built a veggie garden, painted part of the house and drunk a lot of good wine