It been a while, but there is really not too much to show as most of my work has been getting panel gaps right.
I am not there yet but getting close, the only way I can describe how its going is as follows…
The car is a Rubik’s Cube….. you move one thing that you think is right, then nothing else fits .. but it all comes together just at the end.
The engine has gone off for it rebuild, and I have been getting new parts for it.
The engine guy is a racing engine specialist and has done the M30 engines before back in the 80s so I’m in good hands.
The engine is being kept to standard specification, will be fully balanced but he’s is going to increase the compression ratio and go to 90mm bore.
Pistons, the size I want are no longer available for the car, the ones I have found are very expensive. However, the custom forged ones cost less than that OEM… so someone is taking advantage of us E9 owners!
Due to the piston being forged (and this is what I’m being told) they normally have to have a bigger tolerance because they expand more than the standard ones – so could be a little nosy on cold start up…. Until warm
I have been recommended to have a “skirt coating” (they do this for Jaguar E type pistons) and this then reduces the tolerance down to standard… so no noise on start-up… We will see!!
The head was cracked and I was trying to find a replacement, however I got recommended a company whom specialise in restoring damaged heads and they are on with that now – what I thought was bad – they think is actually good and well within their capability to repair.
They are also putting in new valve seats and valve guides.
The head will also be sent off for some sort of pressure impregnation treatment to stop it being porous ( it will have been pressure tested) but this is something he says it well wort it as an extra as its only a few ££ more.
I am putting in new valves – rocker shafts, rocker arms etc etc
The block has had a hard time and when I got the car, no 3 pistons was seized… so on strip down that bore was badly scratched – all the other were very good.
However, it was too badly scratched to bore out and it has been re sleeved, and the block is now all prepped ready for the rebuild.
The crank has been reground to +25 so was in good condition…
The flywheel has been reground smooth.
The list of parts is quite long… and dammed expensive…
And a few unforeseen things I had to get…
The cam was chipped and worn – so a new one!
The con rods were rusty and slightly different weight – so I got a new matching set.
The front pully was all chipped – so a new one.
Once the engine is built its going to be run on his dyno and set up there.
It will cost me a few extra ££ but I like the idea that any problems with the fuel injection set up will be sorted and that It should start on the button when put into the car…
All the engine aluminium has been blasted and now is ready to go for vapour blasting, but a couple of the castings have suffered and rotted out – so I ground off the rot and re welded up the ends – so that has saved me a few ££.
I am not there yet but getting close, the only way I can describe how its going is as follows…
The car is a Rubik’s Cube….. you move one thing that you think is right, then nothing else fits .. but it all comes together just at the end.
The engine has gone off for it rebuild, and I have been getting new parts for it.
The engine guy is a racing engine specialist and has done the M30 engines before back in the 80s so I’m in good hands.
The engine is being kept to standard specification, will be fully balanced but he’s is going to increase the compression ratio and go to 90mm bore.
Pistons, the size I want are no longer available for the car, the ones I have found are very expensive. However, the custom forged ones cost less than that OEM… so someone is taking advantage of us E9 owners!
Due to the piston being forged (and this is what I’m being told) they normally have to have a bigger tolerance because they expand more than the standard ones – so could be a little nosy on cold start up…. Until warm
I have been recommended to have a “skirt coating” (they do this for Jaguar E type pistons) and this then reduces the tolerance down to standard… so no noise on start-up… We will see!!
The head was cracked and I was trying to find a replacement, however I got recommended a company whom specialise in restoring damaged heads and they are on with that now – what I thought was bad – they think is actually good and well within their capability to repair.
They are also putting in new valve seats and valve guides.
The head will also be sent off for some sort of pressure impregnation treatment to stop it being porous ( it will have been pressure tested) but this is something he says it well wort it as an extra as its only a few ££ more.
I am putting in new valves – rocker shafts, rocker arms etc etc
The block has had a hard time and when I got the car, no 3 pistons was seized… so on strip down that bore was badly scratched – all the other were very good.
However, it was too badly scratched to bore out and it has been re sleeved, and the block is now all prepped ready for the rebuild.
The crank has been reground to +25 so was in good condition…
The flywheel has been reground smooth.
The list of parts is quite long… and dammed expensive…
And a few unforeseen things I had to get…
The cam was chipped and worn – so a new one!
The con rods were rusty and slightly different weight – so I got a new matching set.
The front pully was all chipped – so a new one.
Once the engine is built its going to be run on his dyno and set up there.
It will cost me a few extra ££ but I like the idea that any problems with the fuel injection set up will be sorted and that It should start on the button when put into the car…